Client: Blu 3
Location: 1 Broadgate, London EC2M
Programme: Aug ‘24 – Sept ‘25
Value: £700,000

Download This Case Study

Enter your email address to receive a PDF copy of this case study.

    Project Outline

    Consara Construction Ltd were contracted by Blu-3 to complete the hard landscaping of the lower levels and external areas of the development at One Broadgate. This project was a joint venture between British Land and GIC, offering some of the highest quality, sustainable mixed-use space in London, including 545,000 sq ft of office workspace and roof terraces and 48,000 sq ft of retail and leisure space.

    Scope of Works

    • RC Construction of fulcrum stairs, below ground concrete planters, numerous foundations & concrete hardstandings.
    • Installation of temporary works including trench box ground retention systems and formwork in heavily confined areas.
    • Reducing levels to formation and installation of various types of paving, allowing for build up in accordance with the relevant design.
    • Installation of all associated drainage and utilities, working in close proximity to live services.
    • Demolition of an existing sub station.
    • Installation of stone cladding and coping to planters.
    • Installation of street furniture including bollards, totems, terrazzo benching, mobile planters.
    • Extensive programme management and key stakeholder engagement to achieve phased handover and opening of areas to meet key project milestones.

    Key Challenges

    • » Interface with other sub contractors working, ensuring segregation and safety of the workforce during the works.
    • » Interface with the public, ensuring segregation of site operations during the works & safety of the public during phased re-opening of footpaths.
    • » Management and storage of materials. Storage space was at a premium for the duration of the works due to the central location of the site. Just in time deliveries were required.
    • » Restricted hours of noisy works, breakout out of concrete/ buried obstructions required close co-ordination with the client and local business’.

    Key Facts

    • Over 4000 m2 of paving & bedding installed including granite & yorkstone
    • Circa 100m3 Concrete poured for footings, hardstandings, RC planters and stairs.
    • 95m2 stone cladding and coping installed.

    Project Gallery

    Click on the images below to view larger.

    1 BROADGATE - Project Image 1 BROADGATE - Project Image 1 BROADGATE - Project Image 1 BROADGATE - Project Image 1 BROADGATE - Project Image 1 BROADGATE - Project Image 1 BROADGATE - Project Image 1 BROADGATE - Project Image

    Contact Us

    Need help with a project? Contact us for more details and to arrange an initial conversation.

      For more details please see our Privacy Policy. This site uses ReCaptcha so the Google Privacy Policy & Terms of Use apply
      Thank you! Your submission has been received!
      Oops! Something went wrong while submitting the form.